Metropolitan Washington Airports Authority
PROJECT eLERT
September 26, 2013
New Projects
The Metropolitan Washington Airports Authority has recently issued solicitations for the following projects:
RFP 1-14-C005: Air Services Development Consultant
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide air service development consulting for passenger and air cargo service for Washington Dulles International Airport, and strategic input, counsel and assistance in support of the Airports Authority’s Air Service Development Program. |
 |
Issue Date: September 25, 2013 |
 |
Due Date for Proposals: October 25, 2013 |
 |
LDBE Requirement: None |
 |
Additional Information |
RFP 1-13-C162: Task Order Construction for Vertical Tasks, National and Dulles Airports
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide construction services for vertical tasks at Ronald Reagan Washington National and Washington Dulles International Airports on a Task Order basis. |
 |
Issue Date: September 24, 2013 |
 |
Due Date for Proposals: October 31, 2013 |
 |
LDBE Requirement: 100% |
 |
Additional Information |
RFQ 1-13-P187: Multifunction Performance Print System, National Airport
 |
Description: The Contractor shall furnish and deliver one new multifunction performance print system having the pertinent salient characteristics that meet or exceed those of the KIP 7100 Multifunctional Performance Print System with PDF Format Printing Software Upgrade for delivery to Ronald Reagan Washington National Airport. |
 |
Issue Date: September 24, 2013 |
 |
Due Date for Proposals: October 15, 2013 |
 |
LDBE Requirement: 100% |
 |
Additional Information |
RFQI 1-13-C186: Archeological/Architectural Historic Preservation Consultant Services, National and Dulles Airport
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide archeological/architectural historic preservation services for the Airports Authority at Washington Dulles International and Ronald Reagan Washington National Airports on an on-call basis. |
 |
Issue Date: September 23, 2013 |
 |
Due Date for Proposals: October 29, 2013 |
 |
LDBE Requirement: 25% |
 |
Additional Information |
RFP 1-13-C191: Landside Perimeter Security - Phase 2, Dulles Airport
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to upgrade existing vehicle access control systems at Gates 127, 130 and 317 at Washington Dulles International Airport. Work includes temporary traffic controls, installation of K12 and K4 rated lift arm hydraulic vehicle barriers, integration of the new barriers to the local barrier control and access control systems and reinforcement of fence lines near the gates. |
 |
Issue Date: September 9, 2013 |
 |
Due Date for Proposals: October 7, 2013 |
 |
LDBE Requirement: 40% |
 |
Additional Information |
RFP 1-14-C003: Guardrail Repair, Maintenance and Installation, On-Call, Dulles Airport
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to repair, maintain and install guardrails along roadways at Washington Dulles International Airport and the Dulles Airport Access Highway on an on-call basis. Work includes but is not limited to removal and disposal of damaged/substandard guardrail systems, furnishing and installing new guardrail systems, and maintaining and controlling traffic in accordance with VDOT and Airports Authority safety requirements. |
 |
Issue Date: September 9, 2013 |
 |
Due Date for Proposals: October 7, 2013 |
 |
LDBE Requirement: None |
 |
Additional Information |
Changes of Note
The Metropolitan Washington Airports Authority has recently issued Amendments for the following projects:
IFB 1-13-C168: Repair Storm Drain Line, National Airport
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to install a cured-in-place liner on a damaged 60" corrugated metal storm drain pipe at Ronald Reagan Washington National Airport. |
 |
Change: Amendment One was issued September 11, 2013. Amendment Two was issued September 25, 2013. The due date for proposals was extended to October 3, 2013. |
 |
Additional Information |
RFQ 3-13-P1367: Testing and Calibration of KWH Meters, Dulles Airport
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide testing and calibration of KWH meters located at Washington Dulles International Airport. |
 |
Change: Amendment One was issued September 24, 2013. The due date for quotations was extended to October 11, 2013. |
 |
Additional Information |
RFP 1-13-C185: Executive Search Services for Vice President of Public Safety
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment, and supervision to provide executive search services to recruit and fill the position of Vice President for Public Safety of the Metropolitan Washington Airports Authority. |
 |
Change: Amendment One was issued September 17, 2013. The due date for proposals remains September 27, 2013. |
 |
Additional Information |
Upcoming Opportunities - Two Week Forecast
The Metropolitan Washington Airports Authority anticipates issuing the following contracting opportunities within the next two weeks:
RFP 1-13-C188: Employee Engagement and Inclusion Survey Program
 |
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to develop, host, administer, analyze and report on an on-going survey of employee engagement and inclusion across the Airports Authority’s workforce of approximately 1500 employees. The Employee Survey Program will provide on-going measures of employee engagement as part of an overall scorecard of corporate measures. |
 |
Estimated Issue Date: October 7, 2013 |
RFP 1-13-C152: Truck-Mounted Herbicide Spray System, Dulles Airport
 |
Description: The Contractor shall design, manufacture, and install a herbicide spray system and rear mounted crash attenuator on an existing truck cab and chassis at Washington Dulles International Airport. |
 |
Estimated Issue Date: October 11, 2013 |
RFP 1-13-C172: Tandem Axle Dump Trucks with Snow Plows, Dulles Airport
 |
Description: The Contractor shall furnish and deliver two new current year tandem axle heavy-duty cab and chassis trucks equipped with a custom built heavy-duty 14’ sheet and post end dump body, snow plow, central hydraulic system with material spreader controls, a minimum of 62,800 lbs GVWR, and having the pertinent salient characteristics of a 6x4, Kenworth T-800B, Mack Granite Axle Back GU-813 carrier unit in accordance with Airports Authority specifications for delivery to Washington Dulles International Airport. |
 |
Estimated Issue Date: October 11, 2013 |
Additional Upcoming Opportunities
Every effort is undertaken to ensure the accuracy of all information contained within each edition of PROJECT eLERT as of the date of issuance. Information is subject to change thereafter. In the event of a discrepancy, information contained in the official Metropolitan Washington Airports Authority RFP and/or RFQ documents shall take precedence.