Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

RFP 1-13-C162: Task Order Construction for Vertical Tasks, National and Dulles Airports NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide construction services for vertical tasks at Ronald Reagan Washington National and Washington Dulles International Airports on a Task Order basis.
- Issue Date: September 24, 2013
- Due Date for Proposals: October 31, 2013
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-13-C191: Landside Perimeter Security - Phase 2, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to upgrade existing vehicle access control systems at Gates 127, 130 and 317 at Washington Dulles International Airport. Work includes temporary traffic controls, installation of K12 and K4 rated lift arm hydraulic vehicle barriers, integration of the new barriers to the local barrier control and access control systems and reinforcement of fence lines near the gates.
- Issue Date: September 9, 2013
- Due Date for Proposals: October 7, 2013
- Amendments Issued: None
- LDBE Requirement: 40%
- Project Overview
- Download Documents

RFP 1-14-C003: Guardrail Repair, Maintenance and Installation, On-Call, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to repair, maintain and install guardrails along roadways at Washington Dulles International Airport and the Dulles Airport Access Highway on an on-call basis. Work includes but is not limited to removal and disposal of damaged/substandard guardrail systems, furnishing and installing new guardrail systems, and maintaining and controlling traffic in accordance with VDOT and Airports Authority safety requirements.
- Issue Date: September 9, 2013
- Due Date for Proposals: October 7, 2013
- Amendments Issued: None
- LDBE Requirement: None
- Project Overview
- Download Documents