Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

RFP 1-13-C132: Landside Pavement Maintenance and Repairs, Dulles Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform pavement maintenance, repairs and marking services for landside roadways, parking lots, sidewalks, curbs and gutters on an as-needed basis at Washington Dulles International Airport.
- Issue Date: May 1, 2013
- Due Date for Proposals: June 6, 2013
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-13-C133: Hangar 4 Roof Replacement, National Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the Hangar 4 roof replacement project at Ronald Reagan Washington National Airport. The project consists of removing insulation and roof membrane, installation of new insulation, protection board, and roofing membrane of approximately 11,658 sf of lower roof over offices and approximately 67,305 sf of upper roof over the Hangar 4 bay. New parapet coping will be installed on the upper-roofing sections. Two new crossover stairs will be installed over existing rooftop piping on the lower roof as well as replacement of existing access ladders from Hangars 3 & 5. A new overflow drainage system will be added to both levels of roof near the existing roof drains. Roof drains and exposed drain piping will also be replaced. Installation of roof hatch complete with ladder and platform.
- Issue Date: May 1, 2013
- Due Date for Proposals: June 6, 2013
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-13-C119: JP Morgan Building Parking Lot Lighting Upgrade, Dulles Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to demolish existing lighting fixtures and furnish and install new light fixtures at the front and rear parking lots of the JP Morgan Building at Washington Dulles International Airport.
- Issue Date: April 29, 2013
- Due Date for Proposals: June 4, 2013
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 1-13-C116: Erosion Control Pads and Infield Grading Repairs, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct bituminous pavement erosion control pads at existing guidance signs around Runways 1C-19C and 12-30 and perform regrading and installation of french drainage systems in infield areas at Washington Dulles International Airport.
- Issue Date: April 22, 2013
- Due Date for Proposals: May 23, 2013
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

RFP 7-13-C014: Replace Sound Wall 106 Along West-Bound Dulles Toll Road
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the replacement of Sound Wall 106 adjacent to Wolf Trap Meadows along the West-Bound Dulles Toll Road. Work shall include but not limited to demolition and disposal of existing wall panels, clearing and grubing, fabrication, delivery and installation of replacement new sound wall panels.
- Issue Date: April 22, 2013
- Due Date for Proposals: May 23, 2013
- Amendments Issued: None
- LDBE Requirement: 30%
- Project Overview
- Download Documents