Current Opportunities - Construction

The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:

1-15-C068: Signage System Upgrade for Terminal B/C, National Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to replace two existing dated electronic signage systems and a static wayfinding system with a single digital signage system incorporating content player management software servicing Terminal B/C at Ronald Reagan Washington National Airport. The installation will include ultra high definition LCD displays, LED edge lit narrow bezel LCDs, data display controllers, analog clock movements, decorative metals, raceways, power and communications cables and terminations, power and communications outlets, demolition of existing systems, etc. The project also includes an Add Alternate for the content player management software, servers, etc. to be ‘hosted off-site’ and network devises will be Authority provided.
- Solicitation Issue Date: May 22, 2015
- Due Date for Submissions: June 25, 2015
- Amendments Issued: None
- LDBE Requirement: 70%
- Project Overview
- Download Documents

1-15-C069: Terminal A Banjo Standby Power Distribution, National Airport NEW!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to connect existing facility standby electrical loads to the newly established standby distribution system in the Terminal A "Banjo" at Ronald Reagan Washington National Airport.
- Solicitation Issue Date: May 11, 2015
- Due Date for Submissions: June 11, 2015
- Amendments Issued: None
- LDBE Requirement: 100%
- Project Overview
- Download Documents

7-15-C018: Pavement Repairs, Dulles Toll Road UPDATED!
- Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform pavement repairs along the Dulles Toll Road, comprising approximately 1.0 mile of mainline pavement along the westbound lanes and 14 entry and exit ramps on eastbound and westbound DTR.
- Solicitation Issue Date: April 30, 2015
- Due Date for Submissions: May 28, 2015
- Amendments Issued: One
- LDBE Requirement: 35%
- Project Overview
- Download Documents