Business Information
- Business Information
- Contracting Opportunities
- General Information
- Equal Opportunity Programs
- Concessions
- Current Contracting Opportunities
- Construction
- Design / Build
- Architectural and Engineering
- Services
- Goods and Equipment
- Concessions
- Dulles Corridor Metrorail Project
- Land Development
- Upcoming Opportunities
- Award Information
- PROJECT eLERT
- MWAA iSupplier Portal
- Materials Management Division
- Tenant Information
- Building Codes Dept
Current Opportunities - Construction
The Metropolitan Washington Airports Authority has issued the following Construction contracting opportunities:
RFP 1-13-C150: Electrical Unit Substation Replacement, Dulles Airport NEW!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to replace the existing electrical unit substation at the J.P. Morgan Chase Building at Washington Dulles International Airport with a new electrical unit substation. Work includes replacing 15Kvolt feeder circuits, providing and installing 15Kvolt pad mounted selector switch, duct bank, trenching, pavement replacement, terminations and reconnecting 480volt feeder conductors. | |
| Issue Date: May 24, 2013 | |
| Due Date for Proposals: June 25, 2013 | |
| Amendments Issued: None | |
| LDBE Requirement: 50% | |
| Project Overview | |
| Download Documents |
RFP 7-13-C018: East-Bound Dulles Toll Road Pavement Repairs UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to make pavement repairs along an approximate 1.2 mile section of the East-Bound Dulles Toll Road from the main toll plaza to the I-495 interchange. | |
| Issue Date: May 15, 2013 | |
| Due Date for Proposals: June 13, 2013 | |
| Amendments Issued: Two | |
| LDBE Requirement: 35% | |
| Project Overview | |
| Download Documents |
RFP 1-13-C132: Landside Pavement Maintenance and Repairs, Dulles Airport UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform pavement maintenance, repairs and marking services for landside roadways, parking lots, sidewalks, curbs and gutters on an as-needed basis at Washington Dulles International Airport. | |
| Issue Date: May 1, 2013 | |
| Due Date for Proposals: June 6, 2013 | |
| Amendments Issued: One | |
| LDBE Requirement: 100% | |
| Project Overview | |
| Download Documents |
RFP 1-13-C133: Hangar 4 Roof Replacement, National Airport
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the Hangar 4 roof replacement project at Ronald Reagan Washington National Airport. The project consists of removing insulation and roof membrane, installation of new insulation, protection board, and roofing membrane of approximately 11,658 sf of lower roof over offices and approximately 67,305 sf of upper roof over the Hangar 4 bay. New parapet coping will be installed on the upper-roofing sections. Two new crossover stairs will be installed over existing rooftop piping on the lower roof as well as replacement of existing access ladders from Hangars 3 & 5. A new overflow drainage system will be added to both levels of roof near the existing roof drains. Roof drains and exposed drain piping will also be replaced. Installation of roof hatch complete with ladder and platform. | |
| Issue Date: May 1, 2013 | |
| Due Date for Proposals: June 6, 2013 | |
| Amendments Issued: None | |
| LDBE Requirement: 100% | |
| Project Overview | |
| Download Documents |
RFP 1-13-C119: JP Morgan Building Parking Lot Lighting Upgrade, Dulles Airport UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to demolish existing lighting fixtures and furnish and install new light fixtures at the front and rear parking lots of the JP Morgan Building at Washington Dulles International Airport. | |
| Issue Date: April 29, 2013 | |
| Due Date for Proposals: June 4, 2013 | |
| Amendments Issued: One | |
| LDBE Requirement: 100% | |
| Project Overview | |
| Download Documents |
RFP 1-13-C116: Erosion Control Pads and Infield Grading Repairs, Dulles Airport UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to construct bituminous pavement erosion control pads at existing guidance signs around Runways 1C-19C and 12-30 and perform regrading and installation of french drainage systems in infield areas at Washington Dulles International Airport. | |
| Issue Date: April 22, 2013 | |
| Due Date for Proposals: June 3, 2013 | |
| Amendments Issued: Three | |
| LDBE Requirement: 100% | |
| Project Overview | |
| Download Documents |
RFP 7-13-C014: Replace Sound Wall 106 Along West-Bound Dulles Toll Road UPDATED!
| Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the replacement of Sound Wall 106 adjacent to Wolf Trap Meadows along the West-Bound Dulles Toll Road. Work shall include but not limited to demolition and disposal of existing wall panels, clearing and grubbing, fabrication, delivery and installation of replacement new sound wall panels. | |
| Issue Date: April 22, 2013 | |
| Due Date for Proposals: May 30, 2013 | |
| Amendments Issued: One | |
| LDBE Requirement: 30% | |
| Project Overview | |
| Download Documents |
