RFP 1-12-C234: High Temperature Hot Water Generator Replacement, Dulles Airport

PROJECT OVERVIEW
|
RFP Issue Date: October 16, 2012
Deadline for Proposals: 2:00 PM (Eastern), November 28, 2012
Pre-Proposal Conference: 1:30 PM (Eastern), November 7, 2012 at the Second Floor Conference Rooms C and D, 45045 Aviation Drive, Dulles Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $4,000,000 - $7,000,000
Project Duration: 358 days from Notice to Proceed
Bond Requirements: 100% Payment, 100% Performance
CD-ROM Fee: $50.00   Instructions for Ordering Documents on CD-ROM
Project Summary:
The Contractor shall provide all necessary labor, materials, tools, equipment and supervision to replace High Temperature Hot Water (HTHW) Generators at Washington Dulles International Airport. The project consists of removal of three existing 70 MMBH HTHW generators and installation of two new Authority furnished 50 MMBH HTHW generators. Removal of one existing HTHW circulation pump, removal and re installation of two existing HTHW circulation pumps including modifications to said pumps are also included in the project. In addition, the project includes relocation of two existing incinerators.
LDBE Requirement:
This RFP has a 35% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 10% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
238210 Electrical Contractors and Other Wiring Installation Contractors $14.0 Million
238220 Plumbing, Heating and Air-Conditioning $14.0 Million
238290 Other Building Equipment Contractors $14.0 Million
238320 Painting and Wall Covering Contractors $14.0 Million
Amendments Issued:
One, October 31, 2012. The due date for proposals remains unchanged.
Two, November 16, 2012. The due date for proposals remains unchanged.
CLICK HERE to download Amendment Documents
Last Updated November 16, 2012