Current Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following contracting opportunities:

 

Construction Opportunities

1-16-C068: Miscellaneous Building Repairs and Alterations (100% LDBE), National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform miscellaneous building repairs and alterations at Ronald Reagan Washington National Airport on a task order basis.
Solicitation Issue Date: April 25, 2016
Due Date for Submissions: May 26, 2016
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

1-16-C069: Miscellaneous Building Repairs and Alterations (50% LDBE), National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform miscellaneous building repairs and alterations at Ronald Reagan Washington National Airport on a task order basis.
Solicitation Issue Date: April 25, 2016
Due Date for Submissions: May 26, 2016
Amendments Issued: None
LDBE Requirement: 50%
Additional Information

7-16-C009: Pavement Maintenance and Repairs for Dulles Toll Road NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform maintenance and repair on roadways, concrete decks, parking lots, sidewalks, curbs and gutters serving the Dulles Toll Road on an on-call basis.
Solicitation Issue Date: April 19, 2016
Due Date for Submissions: May 19, 2016
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

1-16-C076: Design Build Immediate Roadway Improvements, National Airport
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and build various improvements to the roadways at Ronald Reagan Washington National Airport. Work includes extending a merge lane and closing a roadway along the airport’s West Entrance Road, adding a new lane at Abingdon Road and updating associated signage as necessary. Construction is limited to night work from 8:00 PM to 5:00 AM and must be completed by November 17, 2016.
Solicitation Issue Date: April 15, 2016
Due Date for Submissions: May 17, 2016
Amendments Issued: None
LDBE Requirement: 25%
Additional Information

1-16-C035: Taxilane C and Taxiway Z Reconstruction, Dulles Airport
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision for the removal and reconstruction of the middle section of Taxilane C and the south section of Taxiway Z at Washington Dulles International Airport. The Taxilane C area is approximately 100 feet wide and 1,940 feet long. The Taxiway Z area is approximately 75 feet wide and 340 feet long, and also includes isoloated panel replacement at Taxiway Y11. The full depth reconstruction includes the replacement with full strength PCC pavement with new joint spacing and underdrain system. Maintenance of air traffic, stormwater pollution prevention and pavement markings are also included.
Solicitation Issue Date: April 7, 2016
Due Date for Submissions: May 13, 2016
Amendments Issued: None
DBE Goal: 20%
Additional Information

7-16-C008: Toll Collection System for Dulles Toll Road
Description: The Contractor shall furnish all necessary labor (including all professional disciplines), materials, equipment, and supervision to design, develop, test, install and maintain a toll collection system for the Dulles Toll Road.
Solicitation Issue Date: April 6, 2016
Due Date for Submissions: June 1, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

Design/Build Opportunities

1-16-C076: Design Build Immediate Roadway Improvements, National Airport
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and build various improvements to the roadways at Ronald Reagan Washington National Airport. Work includes extending a merge lane and closing a roadway along the airport’s West Entrance Road, adding a new lane at Abingdon Road and updating associated signage as necessary. Construction is limited to night work from 8:00 PM to 5:00 AM and must be completed by November 17, 2016.
Solicitation Issue Date: April 15, 2016
Due Date for Submissions: May 17, 2016
Amendments Issued: None
LDBE Requirement: 25%
Additional Information

7-16-C008: Toll Collection System for Dulles Toll Road
Description: The Contractor shall furnish all necessary labor (including all professional disciplines), materials, equipment, and supervision to design, develop, test, install and maintain a toll collection system for the Dulles Toll Road.
Solicitation Issue Date: April 6, 2016
Due Date for Submissions: June 1, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

Architectural & Engineering Opportunities

None

Services Opportunities

1-16-C080: Redundant Point to Point Ethernet Circuits for Data Center NEW
Description: The Airports Authority requires the services of one (1) provider to provision a 10 Gbps point to point Ethernet Circuits from Verizon Terremark Data Center (Ashburn) to Ronald Reagan Washington National Airport.
Solicitation Issue Date: May 2, 2016
Due Date for Submissions: May 12, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

1-16-C063: Drinking Water Testing, National Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to perform drinking water testing and analysis for bacteria, Total Trihalomethanes (THM), and Haloacetic Acids (HAA) at Ronald Reagan Washington National Airport in accordance with Virginia Department of Health Waterworks and the Environmental Protection Agency regulations.
Solicitation Issue Date: April 27, 2016
Due Date for Submissions: June 1, 2016
Amendments Issued: None
LDBE Requirement: 100%
Additional Information

1-16-C067: After Hours Service Desk Support NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide live personnel that will receive and process telephone calls for technical assistance made by airport tenants and Airports Authority employees to the Technology Services Desk during non-business hours to include Tier 1 incident support.
Solicitation Issue Date: April 22, 2016
Due Date for Submissions: May 12, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

1-16-C074: News Clipping Services NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to monitor print publications, broadcast news and other electronic sources, including the Internet, analyze and deliver daily "news clipping services" as well as provide broadcast and cable news monitoring, search, retrieval, compilation and distribution of video clips to the Airports Authority.
Solicitation Issue Date: April 22, 2016
Due Date for Submissions: May 24, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

3-16-B0003: Automotive Lift Maintenance, Dulles Airport NEW
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to provide annual maintenance, and repairs of in-ground and above-ground automotive lift equipment in accordance with current ANSI/ALIALOIM standards for the Equipment Maintenance Division at Washington Dulles International Airport.
Solicitation Issue Date: April 19, 2016
Due Date for Submissions: May 18, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

7-16-C008: Toll Collection System for Dulles Toll Road
Description: The Contractor shall furnish all necessary labor (including all professional disciplines), materials, equipment, and supervision to design, develop, test, install and maintain a toll collection system for the Dulles Toll Road.
Solicitation Issue Date: April 6, 2016
Due Date for Submissions: June 1, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

3-16-P0311: Smart Key System Replacement, Dulles Airport UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and install a “Smart Key” system for controlling access to sensitive areas on and within the property of Washington Dulles International Airport. The system will be used to control access for parameter fences, remote electric vaults, fire department medicine cabinets and other sensitive places where an audit trail is needed. The system will replace an existing Intella-Key brand system.
Solicitation Issue Date: March 31, 2016
Due Date for Submissions: May 6, 2016
Amendments Issued: Three
LDBE Requirement: None
Additional Information

Goods and Equipment Opportunities

8-16-C004: Pickup Trucks for Dulles Corridor Metrorail Project NEW
Description: The Contractor shall furnish and deliver ten half ton, 4-wheel drive, extended cab pick-up trucks in accordance with Airports Authority specifications for use on the Dulles Corridor Metrorail Project.
Solicitation Issue Date: April 28, 2016
Due Date for Submissions: May 19, 2016
Amendments Issued: None
DBE Goal: None
Additional Information

1-16-C024: Solid Runway Deicer, National and Dulles Airports
Description: The Contractor shall furnish and deliver an FAA approved bulk and bagged solid runway and taxiway deicer for delivery to Ronald Reagan Washington National and Washington Dulles International Airports on an as-needed basis.
Solicitation Issue Date: April 15, 2016
Due Date for Submissions: May 16, 2016
Amendments Issued: None
LDBE Requirement: None
Additional Information

8-16-P002: Battery Front Cover Shields, Dulles Corridor Metrorail Project
Description: The Contractor shall furnish and deliver 360 battery front cover shields in accordance with Airports Authority specifications (Electro-Tyte RC Battery Clear Front Cover Shields, Cope Plastics 848724245, or equal) for use on the Dulles Corridor Metrorail Project.
Solicitation Issue Date: April 14, 2016
Due Date for Submissions: May 12, 2016
Amendments Issued: None
DBE Goal: None
Additional Information

3-16-P0311: Smart Key System Replacement, Dulles Airport UPDATED
Description: The Contractor shall furnish all necessary labor, materials, tools, equipment and supervision to design and install a “Smart Key” system for controlling access to sensitive areas on and within the property of Washington Dulles International Airport. The system will be used to control access for parameter fences, remote electric vaults, fire department medicine cabinets and other sensitive places where an audit trail is needed. The system will replace an existing Intella-Key brand system.
Solicitation Issue Date: March 31, 2016
Due Date for Submissions: May 6, 2016
Amendments Issued: Three
LDBE Requirement: None
Additional Information

Concessions Opportunities

None

Dulles Corridor Metrorail Project Opportunities

Project Overview - Dulles Corridor Metrorail Project

Phase One of the Dulles Corridor Metrorail Project constructed the new Metrorail Silver Line from the East Falls Church station on the Orange Line, through Tysons Corner and on to Wiehle Avenue in Reston. Phase Two will continue the line to Dulles International Airport and into Loudoun County.

Dulles Corridor Metrorail Project - Phase Two

Capital Rail Constructors, a joint venture of Clark Construction Group and Kiewit Infrastructure South, is the Metropolitan Washington Airports Authority's design-build contractor for Phase Two of the Dulles Corridor Metrorail Project, which will build 11.4 miles of track and six stations in Fairfax and Loudoun counties. Construction of Phase Two began in 2013 and will continue through 2018.

The following link will take you to the Capital Rail Constructors website where you can learn about subcontracting opportunities for Phase Two of the Dulles Corridor Metrorail Project:

Capital Rail Constructors Subcontracting Information

Additional Dulles Corridor Metrorail Project Contracting Opportunities

The Metropolitan Washington Airports Authority has issued the following additional contracting opportunities for the Dulles Corridor Metrorail Project:

8-16-C004: Pickup Trucks for Dulles Corridor Metrorail Project NEW
Description: The Contractor shall furnish and deliver ten half ton, 4-wheel drive, extended cab pick-up trucks in accordance with Airports Authority specifications for use on the Dulles Corridor Metrorail Project.
Solicitation Issue Date: April 28, 2016
Due Date for Submissions: May 19, 2016
Amendments Issued: None
DBE Goal: None
Additional Information

8-16-P002: Battery Front Cover Shields, Dulles Corridor Metrorail Project
Description: The Contractor shall furnish and deliver 360 battery front cover shields in accordance with Airports Authority specifications (Electro-Tyte RC Battery Clear Front Cover Shields, Cope Plastics 848724245, or equal) for use on the Dulles Corridor Metrorail Project.
Solicitation Issue Date: April 14, 2016
Due Date for Submissions: May 12, 2016
Amendments Issued: None
DBE Goal: None
Additional Information

Land Development Opportunities

Unsolicited Proposals for Western Lands at Dulles Airport
Description: The Metropolitan Washington Airports Authority has approximately 425 acres of land located at the western boundary of Washington Dulles International Airport along Route 606 which are available for development. Interested parties may submit an Unsolicited Proposal for the lease of any or all of this property.
Additional Information