Metropolitan Washington Airport Authority

RFP 1-08-C191: Soil Bank Management, Dulles Airport

|
PROJECT OVERVIEW
|
|
RFP Issue Date: June 27, 2008
Deadline for Proposals: 2:00 PM (Eastern), July 29, 2008
Pre-Proposal Conference: 10:00 AM (Eastern), July 10, 2008 at Conference Room A, Second Floor, 45045 Aviation Drive, Dulles Airport
Question Submission: The deadline for submitting questions has passed.
No further questions will be accepted.
Estimated Dollar Value: $500,000 - $1,000,000 annually
Project Duration: One year base period with a one-year option
Bond Requirements: None
Fee for Plans: $30.00 for printed documents; free download
Project Summary:
The Contractor shall provide all labor, supervision, tools, equipment, and materials to perform grading work at the soil stockpile area at Washington Dulles International Airport.
LDBE Requirement:
This RFP has a 100% Local Disadvantaged Business Enterprise (LDBE) participation requirement and a 100% Voluntary MBE/WBE goal. Firms located within a 100-mile radius and whose 3 year average gross receipts, including all affiliates, do not exceed the size standard(s) below are eligible for consideration. For more LDBE/MBE/WBE information, including other LDBE size standards, contact the Equal Opportunity Programs Department at 703-417-8625.
LDBE Size Standards:
NAICS Code Type of Work / Service LDBE Size Standard
237310 Highway, Street and Bridge Construction $31.0 Million
238910 Sitework Contractors $13.0 Million
Amendments Issued:
None
Last Updated July 18, 2008