Business Information
- Business Information
- Contracting Opportunities
- General Information
- Concessions
- Equal Opportunity Programs
- Current Contracting Opportunities
- Upcoming Opportunities
- Two Week Forecast
- Major Construction and Design Opportunities
- Recurring Goods & Services Opportunities
- Award Information
- 18th Annual Business Opportunity Seminar
- PROJECT eLERT
- Materials Management Division
- Tenant Information
- Building Codes Dept
Upcoming Opportunities - Major Construction and Design
The Metropolitan Washington Airports Authority anticipates issuing Requests for Proposals (RFPs) or Requests for Qualifications (RFQs) for the following major Construction and Design projects throughout the second half of 2008 and into 2009. Please note that this is not necessarily a complete list of projects that will be issued during this time period, and all dates are estimates and subject to change at any time.
Third Quarter 2008
Permanent Sign System Rehabilitation, Early Package 1, Dulles Airport
| Description: The project will rehabilitate existing signs and replace signs at the terminal departures level, terminal arrivals level, and the daily parking connectors. The construction scope of work includes providing lighting requirements and electrical connections for backlit signs, removable message panels, and dynamic display signs at specified locations. | |
| Estimated Issue Date: September 18, 2008 | |
| Estimated Dollar Value: $1,000,000 - $2,000,000 | |
| Project Type: Construction |
Fourth Quarter 2008
Demolition of Existing NOAA Facilities, Dulles Airport
| Description: This project will facilitate the demolition of the exisitng NOAA Campus after the relocation of these facilities is complete. The project involves termination of various utility connections, demolition of structures and site restoration. | |
| Estimated Issue Date: Fourth Quarter 2008 | |
| Estimated Dollar Value: Up to $500,000 | |
| Project Type: Construction |
Fourth Runway and Associated Taxiways - Deicing and Support Facilities, Dulles Airport
| Description: This project will construct two facilities in support of the new north/south runway. A deicing facility will consist of a single story metal structure with a mezzanine personnel support area. Also included as part of this building will be a deicing truck loading area for glycol delivery/recovery and a glycol storage and blending area. The second facility is a support facility with various storage and maintenance functions. | |
| Estimated Issue Date: Fourth Quarter 2008 | |
| Estimated Dollar Value: $500,000 - $1,000,000 | |
| Project Type: Construction |
Gate 313 Sanitary System, Dulles Airport
| Description: This project will provide a sanitary sewer line connection from Gate 313 to the Stallion Branch sanitary sewer system. | |
| Estimated Issue Date: Fourth Quarter 2008 | |
| Estimated Dollar Value: Up to $500,000 | |
| Project Type: Construction |
South Baggage Basement EDS In-Line High Volume Baggage Screening, Dulles Airport
| Description: This project will facilitate integration of the Explosive Detection System baggage screening operations including conveyance system built-out, existing utility modifications and TSA support in the South Bag Basement at the Main Terminal. Project will be phased to maintain the existing baggage operations. | |
| Estimated Issue Date: Fourth Quarter 2008 | |
| Estimated Dollar Value: $30,000,000 - $50,000,000 | |
| Project Type: Construction |
First Quarter 2009 and Beyond
15/33 Runway Overlay and Taxiway Rehabilitation, National Airport
| Description: This project will provide asphalt resurfacing to various sections of Runway 15/33. The contract includes new PCC pavement, bituminous shoulders, and installation of associated drainage, lighting, and markings. | |
| Estimated Issue Date: First Quarter 2009 | |
| Estimated Dollar Value: $10,000,000 - $15,000,000 | |
| Project Type: Construction |
New Apron at Demolished ARFF Site, National Airport
| Description: This project will replace the site and foundation of the existing ARFF Station 301 with pavement capable of supporting parked aircraft. The contract includes new PCC pavement, installation of associated drainage, signage and markings. | |
| Estimated Issue Date: First Quarter 2009 | |
| Estimated Dollar Value: $1,000,000 - $5,000,000 | |
| Project Type: Construction |