Metropolitan Washington Airport Authority

Upcoming Opportunities - Recurring Goods & Services Opportunities

The Metropolitan Washington Airports Authority anticipates issuing Requests for Proposals (RFPs) for the following recurring goods and service contracts throughout the remainder of 2008 and into 2009. Please note that this is not necessarily a complete list of projects that will be issued during this time period, and all dates are estimates and subject to change at any time.

Fourth Quarter 2008

Custodial Services, National Airport AVAILABLE NOW!
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to provide custodial services at Ronald Reagan Washington National Airport.
- Issue Date: October 28, 2008
- Estimated Dollar Value: $4,000,000 - $6,000,000 annually
- Project Type: Services
- Additional Information

Maintenance for Elevators, Escalators, and Moving Walkways, Dulles Airport
- Description: The Contractor shall furnish all necessary manpower, supervision, materials, tools, parts, supplies, lubricants and equipment necessary to perform full maintenance and repair, preventive maintenance, 24 hour call back, inspection support and supplemental services for all Authority owned elevators, escalators, moving walkways and accessibility lifts at Washington Dulles International Airport.
- Estimated Issue Date: December 4, 2008
- Estimated Dollar Value: $4,000,000 - $6,000,000 annually
- Project Type: Services

Disposal of Hazardous Waste, National Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to provide environmental services to identify, package, label, load, transport, and dispose of hazardous or universal waste material from Ronald Reagan Washington National Airport.
- Estimated Issue Date: December 2008
- Estimated Dollar Value: $25,000 - $100,000 annually
- Project Type: Services

Glycol Recovery, National & Dulles Airports
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to collect, treat and dispose of glycol during aircraft deicing operations at both Ronald Reagan Washington National and Washington Dulles International Airports.
- Estimated Issue Date: December 2008
- Estimated Dollar Value: $1,000,000 - $3,000,000 annually
- Project Type: Services

Engineering Services, National Airport
- Description: The Contractor shall provide general engineering services to furnish all disciplines, materials, tools and equipment for preparation of (a) Facilities Condition Assessment studies; (b) development of maintenance tasks; (c) entry of equipment inventory and maintenance tasks into a CMMS database; (d) management reports; (e) Operation and Maintenance Manuals and (f) equipment/asset surveys of selected facilities at Ronald Reagan Washington National Airport.
- Estimated Issue Date: December 2008 / January 2009
- Estimated Dollar Value: $50,000 - $100,000 annually
- Project Type: Services

Back to Top

First Quarter 2009

Airside Snow Removal, Dulles Airport
- Description: The Contractor shall provide all necessary labor, materials, tools, equipment and supervision to provide airside snow removal and ice control services at Washington Dulles International Airport.
- Estimated Issue Date: January 2009
- Estimated Dollar Value: $1,000,000 - $2,000,000 annually
- Project Type: Services

Bulk Propane Gas, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to furnish bulk propane gas to the Live Fire Training Facility at Washington Dulles International Airport.
- Estimated Issue Date: January 2009
- Estimated Dollar Value: $100,000 - $250,000 annually
- Project Type: Goods

Manage Airport Communications System, National & Dulles Airports
- Description: The Contractor shall provide labor, equipment, supplies, and supervision to manage, operate and maintain the Airport Communications System at Ronald Reagan Washington National and Washington Dulles International Airports.
- Estimated Issue Date: Feruary / March 2009
- Estimated Dollar Value: $1,000,000 - $3,000,000 annually
- Project Type: Services

Chiller Maintenance Services, National Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to provide chemical treatment and service for heating and cooling equipment and associated piping at Ronald Reagan Washington National Airport.
- Estimated Issue Date: March 2009
- Estimated Dollar Value: $25,000 - $100,000 annually
- Project Type: Services

Ground Transportation Surveillance Services, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to conduct surveillance and monitor the services of ground transportation contracts at Washington Dulles International Airport to include (1) the public parking & courtesy shuttle bus service, (2) shared-ride van operation, (3) Washington Flyer Bus system operations, (4) Washington Flyer Bus system ticket sales, (5) employee shuttle bus service, and (6) rental car providers.
- Estimated Issue Date: First Quarter 2009
- Estimated Dollar Value: $25,000 - $100,000 annually
- Project Type: Services

Back to Top

Second Quarter 2009

MUFIDS Operation and Maintenance, Dulles Airport
- Description: The Contractor shall provide services to operate and maintain the Multi-User Flight Information Display System (MUFIDS) at Washington Dulles International Airport.
- Estimated Issue Date: Second Quarter 2009
- Estimated Dollar Value: $500,000 - $1,000,000 annually
- Project Type: Services

Back to Top

Third Quarter 2009

Abrasive Materials for Snow & Ice Control, Dulles Airport
- Description: The Contractor shall provide abrasive materials (salt and sand) for snow and ice control at Washington Dulles International Airport.
- Estimated Issue Date: Third Quarter 2009
- Estimated Dollar Value: $250,000 - $500,000 annually
- Project Type: Goods

DBE Application Reviews
- Description: The Contractor shall provide professional consulting services for conducting reviews of, and making recommended certification decisions on, Disadvantaged Business Enterprise (DBE) certification applications and DBE certification denial appeals.
- Estimated Issue Date: Third Quarter 2009
- Estimated Dollar Value: $25,000 - $100,000 annually
- Project Type: Services

Information Systems Operational Support
- Description: The Contractor shall provide information systems operational support to the Metropolitan Washington Airports Authority to include requirements analysis, evaluation, design, development, selection, implementation, operation, and maintenance of the technology infrastructure and applications used throughout the Airports Authority.
- Estimated Issue Date: Third Quarter 2009
- Estimated Dollar Value: $4,000,000 - $6,000,000 annually
- Project Type: Services

Medical Services
- Description: As part of the Metropolitan Washington Airports Authority's an ongoing occupational health medical program, the Contractor shall provide the Airports Authority with a comprehensive set of occupational health monitoring services under the direction of a lead or chief physician, designated as the Medical Director.
- Estimated Issue Date: Third Quarter 2009
- Estimated Dollar Value: $250,000 - $500,000 annually
- Project Type: Services

Sodium Acetate Deicing Solid, National & Dulles Airports
- Description: The Contractor shall provide Sodium Acetate based deicing/anti-deicing solid in the form of a free flowing sphere for runways, taxiways and sidewalks at Ronald Reagan Washington National and Washington Dulles International Airports.
- Estimated Issue Date: Third Quarter 2009
- Estimated Dollar Value: $500,000 - $1,000,000 annually
- Project Type: Services

Back to Top

Fourth Quarter 2009

Glass and Curtainwall Cleaning, National Airport
- Description: The Contractor shall perform periodic cleaning of windows and aluminum curtainwall at Ronald Reagan Washington National Airport.
- Estimated Issue Date: Fourth Quarter 2009
- Estimated Dollar Value: $100,000 - $250,000 annually
- Project Type: Services

Back to Top