The Metropolitan Washington Airports Authority anticipates issuing the following contracting opportunities within the next two weeks. Please note that this is not necessarily a complete list of projects that will be issued during this time period, and all dates are estimates and subject to change at any time.

RFP 1-08-C253: Permanent Sign System, Early Package 1, Dulles Airport AVAILABLE NOW!
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to construct the Permanent Sign System, Early Design Package 1 at Washington Dulles International Airport. The project includes interior signage required to improve wayfinding at Dulles Airport in keeping with the opening of the new airport train system in 2009. New illuminated signs and non-illuminated signs will be required at existing Concourses A, B, and Z, and the moving walkway tunnel between Concourse B and the Main Terminal. Gate renumbering will be required at Concourses A and B.
- Issue Date: September 29, 2008
- Additional Information

RFP 4-08-C001: Luggage Cart Concession, Dulles Airport AVAILABLE NOW!
- Description: The Metropolitan Washington Airports Authority is seeking proposals from all interested and qualified Offerors desiring to install, operate and manage a first class luggage cart concession at Washington Dulles International Airport. The concession shall consist of (1) a rental luggage cart service for domestic passengers and (2) a courtesy (free to passengers) cart service to the Airports Authority's passengers in the United Airlines Federal Inspection Services (FIS) Facility and the International Arrivals Building (IAB).
- Issue Date: October 2, 2008
- Additional Information

RFP 1-08-C260: HVAC Improvements, Shop II & Metal Shop, Dulles Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to improve HVAC systems in shop buildings at Washington Dulles International Airport.  Work includes installing a rooftop unit and vehicle exhausts at the Vehicle Maintenance Shop (Shop II) and removing existing and installing two new roof exhaust fans at the Metal Shop.
- Estimated Issue Date: October 9, 2008

RFP 1-08-C262: Computer Room Uninterruptible Power Supply Replacement, National Airport
- Description: The Contractor shall furnish all necessary labor, material, tools, equipment, and supervision to replace the existing 30kVA Uninterruptible Power Supply (UPS) unit with a new 80kVA unit in the computer room at the Airports Authority's corporate office building at Ronald Reagan Washington National Airport.
- Estimated Issue Date: October 10, 2008