Metropolitan Washington Airport Authority

Request For Inspection

Metropolitan Washington Airports Authority

REQUEST FOR INSPECTION

PHONE: (703) 417-8150    FAX: (703) 417-8199
Please complete each form section.
All items are required.
 


DULLES
NATIONAL

 

CONTRACTOR: PERMIT NO.: MWAA CONTACT:
CONTACT: PHONE: (xxx-xxx-xxxx) PROJECT:

TYPE OF INSPECTION:      PARTIAL   FINAL   RE-INSPECTION
TYPE OF WORK:
FOOTING ELECTRICAL FIRE SPRINKLER SYSTEM
ELECTRICAL DUCTBANK MECHANICAL DUCT INSTALLATION FIRE ALARM SYSTEM
SLAB PLUMBING PLUMBING WASTE/VENT TEST
PLUMBING PRESSURE TEST FIRE SPRINKLER HYDROSTATIC TEST
MECHANICAL HYDRONIC SYSTEM
STRUCT. FRAMING INSULATION EROSION CONTROL
        OTHER 
DATE REQUESTED: (mm/dd/yyyy)           LOCATION:

TIME: (i.e. 9:00 am)

Your E-mail Address: 
Cc    E-mail Address: 
Please use a single comma to separate multiple email addresses.  Only email addresses @mwaa.com are supported due to security reasons. 


      


Inspection requests may be hand carried, faxed, emailed or phoned in. All of the information indicated above must be provided on each request for inspection.

The Building Code Department requests a 48 hour notice for an inspection, but will make every effort to accommodate next day requests. Inspections should not be scheduled prior to 7:00am or after 3:00pm.

The Metropolitan Washington Airports Authority, through the Building Code Department, requires the following inspections as required by the Uniform Statewide Building Code (USBC):

1. Inspection of footing excavations and reinforcement material for concrete footings prior to the placement of concrete.

2. Inspection of foundation systems during phases of construction necessary to assure compliance with USBC.

3. Inspection of preparatory work prior to the placement of concrete.

4. Inspection of structural members and fasteners prior to concealment.

5. Inspection of electrical, mechanical and plumbing materials and systems prior to concealment.

6. Inspection of energy conservation material prior to concealment.

7. Upon completion of the building and before issuance of the Certificate of Occupancy, a final inspection shall be made.

MWAA FORM ED-04 (4-99)