Dulles International Airport
- About Dulles International
- About Dulles International Airport
- A to Z Index of Dulles Information
- Travel Tips
- Air Cargo
- Special Events
- History
- Facts
- Construction Program
- D2 Projects Map
- Project Details
- AeroTrain System
- AeroTrain Maintenance Facility
- Airport Traffic Control Tower
- Concourse B Expansion
- Concourse C/D
- Fourth Runway
- Future Fifth Runway
- IAB Expansion
- Main Terminal AeroTrain Station
- Main Terminal Improvement Project
- Parking Garages
- Passenger Walkway
- Roadway Improvements
- Runway 12-30 Reconstruction
- Z-Gates
- About D2
- D2 Photo Galleries
- Dulles Environment Studies
- Dulles Corridor Information
- Pass & ID Office
- IAD Photo Galleries
International Arrivals Building Expansion
In response to continuing growth in international air service at Washington Dulles International Airport, the Metropolitan Washington Airports Authority opened the International Arrivals Building (IAB) in 1991, when Dulles was serving approximately 1.4 million international passengers a year. By the end of 2007, the number of passengers arriving from abroad increased to six million passengers annually with the addition of new international flights.
The expansion of the previous facility allows the Customs and Border Protection Services to serve approximately 2,400 passengers per hour--nearly double that of its previous capacity. Baggage claim devices were enlarged and new primary inspection positions were added. Skylights and a large window area allow natural light to filter into the space providing a more welcoming entry to the United States.
The project was divided into three phases to minimize disruption to passengers. The first phase which expanded the arrivals hall and primary inspection positions opened to passengers September 22, 2009 (click here for press release). The second phase which expanded the baggage claim hall opened November 3, 2010. The third phase which replaces the original bag claim devices was completed in September 2011. Follow-on enhancements to the baggage check and passenger greeting areas are underway.
Statistics about the International Arrivals Building Expansion Improvements (table):
| Previous | Expansion | |
| Passengers Per Hour | 1400 | 2400 |
| Total Floor Area | 188,263 sf | 394,263 sf |
| Primary Inspection Positions | 38 | 50 |
| Passenger Queuing Area | 19,800 sf | 41,400 sf |
| Bag Claim Devices | 6 | 6 + Odd Size |
| Bag Claim Presentation | 960 lf | 1792 lf |
Construction Information:
- Design Contractor: Pierce Goodwin Alexander & Linville (PGAL)
- Construction Contractor: Clark Construction Group, LLC
- Completion date: September 2011